SR528 and Innovation Way Interchange 1-5

INTERCHANGE DESIGN

SR 417 SB Ramp to SR 528 WB Ramp Realignment

SR 417 SB Ramp to SR 528 WB Ramp Realignment

Reconstructed existing ramp between two freeway facilities to increase the design speed of the ramp from 40 mph to 60 mph in Orange County.

SR 528  Innovation Way Design Build Criteria Package

SR 528 Innovation Way Design Build Criteria Package

Design/build criteria package for a new interchange consisting of the addition of five ramps (including one loop ramp)